HomeHot Dip Galvanizing

Hot Dip Galvanizing



1 Formal CPD Hour

3:00 PM AEST
1 Hour Online Presentation

 

Presented by David Harrison

Specification of inappropriate corrosion protection systems is a real industry issue, impacting on capital and maintenance costs, safety and the environment, and for the best outcome, durability is something that should be considered in the concept design stage of a project.
Understanding the basics of corrosion and how to determine the corrosivity of a location using Australian Standards, is essential in designing for durability and the selection of the most appropriate corrosion protection system.

Hot dip galvanizing has typically the lowest life cycle cost of any corrosion protection system for structural steel and is the only coating with an EPD. An understanding of the galvanizing process, standards, and how to specify galvanizing, will ensure that the best galvanized finish and lowest cost outcome is achieved.

 


 

At the end of this presentation attendees will:

 

  • How zinc protects steel from corrosion
  • How to determine the corrosivity of a location using Australian Standards
  • The galvanizing process, Standards, and how to specify galvanizing
  • Basics of designing against corrosion and how to design for galvanizing
  • Achieving the desired initial thickness and appearance

 

Our Sponsors
   

 

 


 

 

inhousegroup

Date

27 Sep 2021

Time

AEST
03:00 PM

Cost

Free

Location

Online Via Link
InHouseGroup3 the CPD Provider 

Architectural Marketplace

Empowering Design

  • ASSA ABLOY Entrance Systems

    Read more
  • Metz Ceramic Tiles

    Read more
  • Veldhoen + Company

    Read more
  • National Precast Concrete Association Australia

    Read more
  • Galvanizers Association of Australia

    Read more
  • EQUITONE

    Read more
  • WorkFit

    Read more
  • Parquet Colour Studio

    Read more
  • Burger Project

    Read more
  • Avoca Beach House

    Read more
  • InHouseGroup3 – Website Development Services

    Read more
  • Victory Offices – InHouseGroup3’s Preferred Venue

    Read more
  • Career Relaunched

    Read more
  • Tensile – Platinum Tower

    Read more
  • Dincel – Developer Reduces Build time By 50% With Dincel Structural Walls

    Read more

 

Comments are closed.